Major Subdivisions | Parcel Identification Number (PIN) and Map | Proposal | Date of Submittal | Stage of Review | Current Status |
Note: Major Subdivisions require approval from the Board of County Commissioners (BOCC). | |||||
Cabe Crossing | 9894-81-5468 | Click here | 2007 |
BOCC approved project on December 1, 2008 |
Recorded - Lots being developed |
Dunhill | 9881-15-7138 | Click here | February 2012 | BOCC approved project on November 20, 2012 | Recorded - Lots being developed Copy of final plat |
Pleasant Green Phase 4 |
9893-87-9972 | Click here | 7/2/2014 |
BOCC approved project on October 21, 2014 |
Preliminary plat recorded - Lots being developed Copy of approved preliminary plat |
Stroud's Creek |
9875-08-0900 | Click here | 7/2/2014 | BOCC approved project on October 21, 2014 | Recorded Copy of recorded final plat |
Annandale at Creekwood | 9880-28-1953 | Click here | August 2012 | BOCC approved project on March 23, 2014 | Recorded - Lots being developed Copy of recorded final plat |
Henderson Woods | 9891-80-0707 9891-60-4884 |
Applicant is proposing to develop 19 single-family residential lots on the 48 acre parcel(s) preserving approximately 43% (906,439 sq. ft.) of land are in open space. Access is currently proposed to be thru Shakori Trail, and existing roadway off Erwin Road. |
2/20/2015 | BOCC approved project on December 7, 2015 | Preliminary plat approved- Construction permits being reviewed. Copy of approved preliminary plat |
Class A Special Use Permits | Parcel Identification Number (PIN) and Map | Proposal | Date of Submittal | Stage of Review | Current Status |
Note: Class A Special Use Permits are reviewed in a quasi-judicial setting requiring approval by the Board of County Commissioners (BOCC). | |||||
White Cross Solar Facility | 9748-32-0786 | Development of a Solar Array, Public Utility on a 35+/- acre parcel owned by William and Carol Bryon. This project is approximately 1,200 feet south of an existing array already developed on White Cross Road. | 3/2/2015 |
Approved by the BOCC on September 1, 2015 |
Developed - Finalizing landscaping Copy of approved site plan |
Emerson Waldorf School Proposed Expansion |
9871-64-7391 9871-64-5632 9871-65-8140 9871-74-3098 9871-72-1935 Map |
The school is requesting to amend their current SUP to both modify and expand their existing campus. The request will involved the review/adoption of a master plan for the campus. The Master Plan is envisioned to support and increase in student population to approximately 350 students by 2030. | 3/2/2015 |
BOCC Approved new master plan on October 6, 2015 |
|
Conditional Use Rezoning |
Parcel Identification Number (PIN) and Map | Proposal | Date of Submittal | Stage of Review | Current Status |
Note: A Conditional Use Rezoning proposes rezoning of property and adoption of site plan by the Board of County Commissioners (BOCC). Review of application is carried out in a legislative process. | |||||
Hart's Mill Master Plan Residential Community | 9835-74-8573 | The project will be a village style development with approximately 34 dwelling units and involve the preservation of approximately 67 acres of the parcel (approximately 60%) as vegetative open space and farm area (i.e. pasture and crop production). | 3/2/2015 |
BOCC Approved new master plan on November 5, 2015 |
|
Class B Special Use Permits | Parcel Identification Number (PIN) and Map | Proposal | Date of Submittal | Stage of Review | Current Status |
Note: Class B Special Use Permits are reviewed in a quasi-judicial setting requiring approval by the Board of Adjustment. | |||||
Construction of a telecommunication facility (i.e. telecommunication tower) at 1941 Mt. Carmel Church Road |
9796-09-9658 (the Buckner Family Farm Trust) - 18 acres in area 9797-00-5005 – an approximately 2 acre parcel of property owned by Edwards Williams. A driveway accessing the proposed tower will be located on this property |
TowerCom IV, LLC has submitted a Class B Special Use Permit application seeking a permit to erect a 199 ft. tall (195 ft. tall tower with a 4 ft. lighting pole at the top for a combined total height of 199 ft.) monopole telecommunication facility (i.e. a telecommunication tower). |
Application submitted on September 30, 2016. |
The application is being reviewed by staff for compliance with the County Unified Development Ordinance (UDO). Neighborhood meeting and required balloon test was held on October 15, 2016. |
Public Hearing scheduled for December 12, 2016. Meeting will be held in the main Conference Room located on the Lower Level of the West Campus Office Building located at 131 West Margaret Lane, Hillsborough, North Carolina |