Major Subdivisions  Parcel Identification Number (PIN) and Map Proposal Date of Submittal  Stage of Review  Current Status
Note: Major Subdivisions require approval from the Board of County Commissioners (BOCC).
Cabe Crossing 9894-81-5468 Click here 2007  

BOCC approved project on December 1, 2008

Recorded - Lots being developed
Copy of recorded final plat

Dunhill 9881-15-7138 Click here February 2012 BOCC approved project on November 20, 2012 Recorded - Lots being developed
Copy of final plat
Pleasant
Green
Phase 4
9893-87-9972 Click here 7/2/2014

BOCC approved project on October 21, 2014

Preliminary plat recorded - Lots being developed
Copy of approved preliminary plat
Stroud's
Creek
9875-08-0900 Click here 7/2/2014 BOCC approved project on October 21, 2014 Recorded
Copy of recorded final plat
Annandale at Creekwood 9880-28-1953 Click here August 2012 BOCC approved project on March 23, 2014 Recorded - Lots being developed
Copy of recorded final plat
Henderson Woods 9891-80-0707
9891-60-4884
Applicant is proposing to develop 19 single-family residential lots on the 48 acre parcel(s) preserving approximately 43% (906,439 sq. ft.) of land are in open space.

Access is currently proposed to be thru Shakori Trail, and existing roadway off Erwin Road.
2/20/2015 BOCC approved project on December 7, 2015 Preliminary plat approved- Construction permits being reviewed.
Copy of approved preliminary plat
Class A Special Use Permits Parcel Identification Number (PIN) and Map Proposal Date of Submittal  Stage of Review Current Status
Note: Class A Special Use Permits are reviewed in a quasi-judicial setting requiring approval by the Board of County Commissioners (BOCC).     
White Cross Solar Facility 9748-32-0786 Development of a Solar Array, Public Utility on a 35+/- acre parcel owned by William and Carol Bryon. This project is approximately 1,200 feet south of an existing array already developed on White Cross Road. 3/2/2015

Approved by the BOCC on September 1, 2015

Developed - Finalizing landscaping
Copy of approved site plan
Emerson Waldorf
School Proposed Expansion
9871-64-7391
9871-64-5632
9871-65-8140
9871-74-3098
9871-72-1935
Map
The school is requesting to amend their current SUP to both modify and expand their existing campus. The request will involved the review/adoption of a master plan for the campus. The Master Plan is envisioned to support and increase in student population to approximately 350 students by 2030. 3/2/2015

BOCC Approved new master plan on October 6, 2015

 
Conditional Use
Rezoning
Parcel Identification Number (PIN) and Map Proposal Date of Submittal Stage of Review Current Status
Note: A Conditional Use Rezoning proposes rezoning of property and adoption of site plan by the Board of County Commissioners (BOCC).  Review of application is carried out in a legislative process.
Hart's Mill Master Plan Residential Community 9835-74-8573 The project will be a village style development with approximately 34 dwelling units and involve the preservation of approximately 67 acres of the parcel (approximately 60%) as vegetative open space and farm area (i.e. pasture and crop production). 3/2/2015

BOCC Approved new master plan on November 5, 2015

 
Class B Special Use Permits Parcel Identification Number (PIN) and Map Proposal Date of Submittal Stage of Review Current Status
Note: Class B Special Use Permits are reviewed in a quasi-judicial setting requiring approval by the Board of Adjustment.

Construction of a telecommunication facility (i.e. telecommunication tower)  at 1941 Mt. Carmel Church Road

9796-09-9658 (the Buckner Family Farm Trust) - 18 acres in area

 9797-00-5005 – an approximately 2 acre parcel of property owned by Edwards Williams.  A driveway accessing the proposed tower will be located on this property

TowerCom IV, LLC has submitted a Class B Special Use Permit application seeking a permit to erect a 199 ft. tall (195 ft. tall tower with a 4 ft. lighting pole at the top for a combined total height of 199 ft.) monopole telecommunication facility (i.e. a telecommunication tower). 

Application submitted on September 30, 2016.

Notification of balloon test date submitted on September 30, 2016

The application is being reviewed by staff for compliance with the County Unified Development Ordinance (UDO).

Neighborhood meeting and required balloon test was held on October 15, 2016.

Public Hearing scheduled for December 12, 2016. 

Meeting will be held in the main Conference Room located on the Lower Level of the West Campus Office Building located at 131 West Margaret Lane, Hillsborough, North Carolina

Application package

Site plan/construction drawings 

Balloon test results